Installed directly on to type 3 aggregate or in some cases directly on to a membrane, the surface is manufactured on site using a cold, one part poured process which can be trafficked within 16 hours. Trailflex is a one part cold poured system. We advise you to consult a ground engineer to ascertain the type of the ground you are working with prior to installation. Membrane may be required beneath the type 3 in the case of heavy clay in the existing ground.
Chelmsford
Rotherham
Morecambe
© Langford Direct 2020